SmartPads

Is it Really Possible to Build a Home in Less Than Four Months?

Once you’ve decided to build the home of your dreams, you want to move in as soon as possible. But in most situations, building a home takes a long time. From contractor delays to weather factors and changes in plans, there are a lot of issues that prolong the move-in date for your new home.

However, there is a better and faster way you can move into the custom home of your dreams. At SmartPads, we can decrease your construction time in less than half through our unique prefab solutions and provide significant savings. For instance:

  • We have a fixed bid for home design, engineering, and build so there are minimal contingencies.
  • The shorter timeframe also provides for a shorter interest rate period on your loan.
  • This also results in significantly less construction draws, saving time and bank charges.
  • All architectural costs are included and capped, as are engineering fees.

What Makes It Go So Fast?

At SmartPads, we eliminate more than 50% of construction line items while simultaneously elevating quality through our phased construction timeline. While our homes are being built in an indoor facility in Utah, site preparation work can be simultaneously done on the land. And since the homes are built in a controlled facility, they avoid any delays due to weather (e.g., snow and thaw/freeze) or insufficient and damaged materials.

There’s nothing worse than your framer being five days late for the job so you must move the start date and consequently he’s now on a different job. Every sub change can move the deadline of a traditional stick build home and the ripple effect continues down the line. At SmartPads, our facility is like a clean baton change in a relay race. As soon as the framing is finished, our plumbers and electricians are ready onsite to start. It’s 100% synchronized.

Our prefab modular homes are delivered and completed onsite much faster than stick-built homes. The entire home is usually completed in 30 days or less.

Yes, It Really Is Possible to Build a Home in Less than 4 Months

From start to finish, our designs take approximately four weeks to build. That includes the concrete foundation, the core infrastructure, and a fully completed exterior and interior for all doors, windows, roof and finishes

Take the first step of building your SmartPads home today.

Contact us to find out more.